{"id":7344,"date":"2026-03-19T17:09:16","date_gmt":"2026-03-19T16:09:16","guid":{"rendered":"https:\/\/energyplusa.de\/?p=7344"},"modified":"2026-03-27T19:20:02","modified_gmt":"2026-03-27T18:20:02","slug":"330-kw-solar-power-plant-liri-confectionery-factory-prizren-kosovo","status":"publish","type":"post","link":"https:\/\/energyplusa.de\/en\/330-kw-solar-power-plant-liri-confectionery-factory-prizren-kosovo\/","title":{"rendered":"330 kW Solar Power Plant \u2013 Liri Confectionery Factory, Prizren, Kosovo"},"content":{"rendered":"<p data-start=\"237\" data-end=\"423\">A 330 kWp rooftop solar PV system installed at the Liri confectionery factory in Prizren, comprising 612 solar modules with an expected annual energy production of approximately 300 MWh.<\/p>\n<p data-start=\"425\" data-end=\"596\">The project was executed through a structured, engineering-driven installation process, covering mechanical installation, electrical works, and final system commissioning.<\/p>\n<div id=\"attachment_7371\" style=\"width: 390px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Rooftop-PV-installation-2.webp\"><img loading=\"lazy\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7371\" class=\"wp-image-7371\" title=\"Precise mounting of PV modules on rooftop structure, ensuring alignment, secure fixing, and compliance with mechanical load requirements.\" src=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Rooftop-PV-installation-2-225x300.webp\" alt=\"Precise mounting of PV modules on rooftop structure, ensuring alignment, secure fixing, and compliance with mechanical load requirements.\" width=\"380\" height=\"507\" srcset=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Rooftop-PV-installation-2-225x300.webp 225w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Rooftop-PV-installation-2-600x800.webp 600w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Rooftop-PV-installation-2-1x1.webp 1w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Rooftop-PV-installation-2-8x10.webp 8w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Rooftop-PV-installation-2.webp 750w\" sizes=\"auto, (max-width: 380px) 100vw, 380px\" \/><\/a><p id=\"caption-attachment-7371\" class=\"wp-caption-text\">Precise mounting of PV modules on rooftop structure, ensuring alignment, secure fixing, and compliance with mechanical load requirements.<\/p><\/div>\n<p data-start=\"598\" data-end=\"856\">The installation began with the precise mounting and alignment of PV modules across the rooftop surface. Special attention was given to module positioning, fixing integrity, and layout consistency to ensure both mechanical stability and optimal energy yield.<\/p>\n<p data-start=\"858\" data-end=\"1148\"><a href=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Cabling.webp\"><img loading=\"lazy\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-7365\" src=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Cabling-225x300.webp\" alt=\"\" width=\"380\" height=\"507\" srcset=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Cabling-225x300.webp 225w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Cabling-600x800.webp 600w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Cabling-1x1.webp 1w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Cabling-8x10.webp 8w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Cabling.webp 750w\" sizes=\"auto, (max-width: 380px) 100vw, 380px\" \/><\/a>Electrical installation works included disciplined cable routing using metallic cable trays, with clear separation of DC conductors and proper cable management. This approach ensures mechanical protection, long-term durability, and ease of maintenance under industrial operating conditions.<\/p>\n<p data-start=\"1296\" data-end=\"1519\">The system integrates Sunergy USA Works modules (590 W and 450 W) and three KSTAR string inverters. Commissioning activities included inverter setup, verification of electrical parameters, and full system activation, ensuring stable and reliable operation from the initial start-up.<\/p>\n<div id=\"attachment_7377\" style=\"width: 390px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Commisioning-KSTAR.webp\"><img loading=\"lazy\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7377\" class=\"wp-image-7377\" src=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Commisioning-KSTAR-150x150.webp\" alt=\"System commissioning and verification of KSTAR inverters, including operational checks, parameter validation, and system activation.\" width=\"380\" height=\"507\" srcset=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Commisioning-KSTAR-225x300.webp 225w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Commisioning-KSTAR-600x800.webp 600w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Commisioning-KSTAR-1x1.webp 1w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Commisioning-KSTAR-8x10.webp 8w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/Commisioning-KSTAR.webp 750w\" sizes=\"auto, (max-width: 380px) 100vw, 380px\" \/><\/a><p id=\"caption-attachment-7377\" class=\"wp-caption-text\">System commissioning and verification of KSTAR inverters, including operational checks, parameter validation, and system activation.<\/p><\/div>\n<p data-start=\"1150\" data-end=\"1346\">The final system configuration reflects a well-organized PV field, optimized according to available roof geometry and system design constraints, resulting in a uniform and efficient module layout.<\/p>\n<div id=\"attachment_7347\" style=\"width: 1034px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled.jpg\"><img loading=\"lazy\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-7347\" class=\"wp-image-7347 size-large\" src=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled-e1773942792581-1024x780.jpg\" alt=\"Installation of a 330 kWp solar PV system on the rooftop of the Liri confectionery factory, Prizren\" width=\"1024\" height=\"780\" srcset=\"https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled-e1773942792581-1024x780.jpg 1024w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled-e1773942792581-300x229.jpg 300w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled-e1773942792581-768x585.jpg 768w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled-e1773942792581-1536x1170.jpg 1536w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled-e1773942792581-600x457.jpg 600w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled-e1773942792581-1x1.jpg 1w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled-e1773942792581-10x8.jpg 10w, https:\/\/energyplusa.de\/wp-content\/uploads\/2026\/03\/1000064204-scaled-e1773942792581.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><p id=\"caption-attachment-7347\" class=\"wp-caption-text\">Installation of a 330 kWp solar PV system on the rooftop of the Liri confectionery factory, Prizren<\/p><\/div>\n<p data-start=\"1639\" data-end=\"1827\">The project demonstrates a complete execution cycle \u2014 from installation to commissioning \u2014 with a strong focus on engineering accuracy, electrical safety, and long-term system performance.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A 330 kWp rooftop solar PV system installed at the \u201cLiri\u201d confectionery factory in Prizren, consisting of 612 solar modules with a combined expected annual energy production of approximately 300 MWh.<\/p>\n","protected":false},"author":2,"featured_media":7347,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[364],"tags":[367,368,366],"class_list":["post-7344","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-our-projects","tag-energy-plus-a","tag-kosovo-solar-projects","tag-solar-projects"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/posts\/7344","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/comments?post=7344"}],"version-history":[{"count":20,"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/posts\/7344\/revisions"}],"predecessor-version":[{"id":7462,"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/posts\/7344\/revisions\/7462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/media\/7347"}],"wp:attachment":[{"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/media?parent=7344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/categories?post=7344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energyplusa.de\/en\/wp-json\/wp\/v2\/tags?post=7344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}